Eliminating a manual step to make production more efficient. This is the goal achieved by Pro.ve.r. through the development of a two-component mould for a subplate: a solution that integrates the gasket directly during the moulding process, eliminating the need for subsequent manual application by an operator. The project originated from a specific customer requirement: to optimise the production process while maintaining the component’s quality and functional standards. The result is a fully finished component that comes directly out of the mould, delivering benefits in terms of costs, overall processing times and repeatability.
The Starting Point: A Manually Applied Gasket
In the original production process, manufacturing the subplate involved two separate stages: moulding the component and subsequently applying the gasket manually. This additional operation required time and labour, affecting production costs and the overall efficiency of the process. Manual intervention also introduced potential variations in quality depending on how the operation was performed. The customer’s request was therefore clear: eliminate the manual application of the gasket without compromising the quality and functionality of the subplate.
The Pro.ve.r. Solution: Integrating the Gasket into the Moulding Process
To meet this requirement, Pro.ve.r. studied and developed a solution based on two-component moulding technology. The mould was designed to integrate the gasket directly into the component during the moulding process.
Using two materials in a single production cycle makes it possible to obtain a fully finished, ready-to-use subplate without the need for subsequent assembly operations.
The gasket thus becomes an integral part of the component during production, eliminating the operation that was previously carried out separately.
This innovative mould design translates into a tangible simplification of the production process: fewer steps are needed to obtain the finished product.
From Feasibility Study to Component Validation
The development of the solution followed a structured process involving both mould design and production process optimisation. The project included:
- Component feasibility study, to assess the possibility of integrating the gasket through two-component moulding.
- Selection of the most suitable two-component moulding technology for the project’s requirements.
- Mould design and manufacturing, aimed at producing the complete component.
- Production process optimisation, to fine-tune the developed solution.
- Final validation of the component and its performance, to verify compliance with quality and functional requirements.
This approach made it possible to eliminate manual assembly by considering the component, the mould and the production process as an integrated system.
The Results: A More Efficient and Repeatable Process
The introduction of the two-component mould eliminated the manual application of the gasket, delivering benefits across several aspects of production.
Reduced Production Costs
Eliminating the additional operation reduced the amount of labour required to complete the component.
Reduced Overall Processing Times
The subplate comes out of the mould fully finished, without requiring a subsequent gasket application stage.
Greater Repeatability and Finished Product Quality
Integrating the gasket into the moulding process reduced potential variations associated with manual intervention.
Improved Production Efficiency
Combining multiple operations into a single integrated process made component production more efficient.
Innovation That Simplifies
This case study demonstrates how mould design can contribute to improving the entire production process.
For the customer, the value of two-component moulding technology translates into the elimination of a manual operation, reduced production costs and processing times, and greater repeatability of the finished product.